As the Babri Masjid demolition clocks in 30 years today, the construction work for the temple is in full swing already. After the Supreme Court waved a green flag to the construction of the Ram temple in Ayodhya, it is believed that the construction of the temple will be completed and open to devotees by 2024.
Shri Ram Janmabhoomi Teerth Kshetra Trust has undertaken the responsibility of the construction of the Ram Temple.
This is how the temple will look after construction
The Ram Janmabhoomi Trust on several occasions has released CGI images of the temple. Here are some of these –
Ram Mandir construction in full swing
Meanwhile, the construction of the Ram Mandir has already begun. The temple is expected to be completed and open to the public by 2024.
Stone quarried in Rajasthan and Karnataka will be used to build the main structure as also the sanctum sanctorum, where the deity will be placed. Carved stones for the temple will be brought from the three workshops the trust operates in Rajasthan, besides one in Ayodhya.
ALSO READ | Ram Mandir: Cheques worth Rs 22 Cr donated to temple trust ‘bounced’, says VHP
ALSO READ | Ayodhya Ram Mandir set to welcome devotees in 2024 | Check details